Štavalj deposit has over 180 million tonnes of coal reserves, which is considered by the Ministry of Mining and Energy as large energy potential of national importance. Pre-feasibility study was developed for the purpose of evaluation of new underground coal mine and thermal power plant complex. Mine is designed with two sets of mechanized longwalls, for the production rate of 2.3 million tonnes per year of run-of-mine coal or 1.68 million tonnes of clean coal. This production is sufficient for thermal power plant of 320 MW, based on circulated fluidized bed combustion boilers and one turbine, with emissions of CO2 at same level than power plants operated by Electric Power Industry of Serbia. Following review of the Pre-feasibility study, possibilities for further improvement of underground coal mine are suggested. These improvements comprises of operation with one larger mechanized longwall set and without coal processing plant. Effects of these suggestions are lower initial investments, lower roadway development requirements, improved energy efficiency at coal production and smaller number of workers, all of which contributing to reduction of capital and operational expenditures and lower cost of fuel.
KEYWORDS
PAPER SUBMITTED: 2008-06-30
PAPER REVISED: 2008-10-20
PAPER ACCEPTED: 2008-12-26
DOI REFERENCE: https://doi.org/10.2298/TSCI0901165C
CITATION EXPORT: view in browser or download as text file
THERMAL SCIENCE YEAR 2009, VOLUME 13, ISSUE Issue 1, PAGES [165 - 174]
REFERENCES
  1. ***, Underground Coal Mining in Serbia, Sustainability, Mine Closure and Social Mitigation Measures, DMT GmbH Montan Consulting, Essen, Germany, 2006
  2. ***, Pre-Feasibility Study for Štavalj Coal Mine and Thermal Power Plant, DMT GmbH Montan Consulting, Essen, Germany, 2007
  3. Cokorilo, V., Mechanized Powered Support, Faculty of Mining and Geology, University of Belgrade, Belgrade, 1993
  4. Oka, S., Fluidized Bed Combustion, Processes and Application (Ed. E. J. Anthony), Marcel Dekker, New York, USA, 2003
  5. Personal communication: Oka, S., Suitability of [tavalj Coal for CFBC Combustion, Belgrade, 2006
  6. Cokorilo, V., Lili}, N., Pinnow, C., Milisavljevi}, V., Possible Trends od Existing Capacity of Underground Coal Mining Modernization, from the Aspect of Energy Development Importance in Serbia, Transaction of VII International Symposium MAREN 2006, Belgrade, 2006, pp. 144-150
  7. ***, National Energy Efficiency Program, Ministry of Science and Technology Development, Project EE-213008a: Control of Green House Gasses Emission by increase Energy Efficiency of Thermal Power Plants in Serbia and Choice of Optimal System for On-Line Measurement of Coal Quality, Energoprojekt - NIRC, 2007, Belgrade (Internal report)

© 2024 Society of Thermal Engineers of Serbia. Published by the Vinča Institute of Nuclear Sciences, National Institute of the Republic of Serbia, Belgrade, Serbia. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution-NonCommercial-NoDerivs 4.0 International licence