ABSTRACT
Expanding implementation of intermittent renewable energy sources has already started to change the role of thermal power plants in energy systems across Europe. Traditionally base load plants are now forced to operate as peaking plants. A familiar transition in upcoming years is expected in Croatia and coal power plant operators are preparing accordingly. To evaluate cycling capabilities and control system operation for flexible operation of selected 210 MW coal plant, series of tests with different load gradients were performed and results were thoroughly analyzed. Two possible “bottlenecks” are identified, thermal stress in superheater header, and achievable ramping rate considering operational limitations of coal feeders, firing system and evaporator dynamics. Several unexpected readings were observed, usually caused by malfunctioning sensors and equipment, resulting in unexpected oscillations of superheated steam temperature. Based on superheater geometry and experimental data, maximal steam temperature gradient during ramping was evaluated. Since thermal stress was well inside the safety margins, the simulation model of the whole boiler was used to evaluate achievable ramping on electric side.
KEYWORDS
PAPER SUBMITTED: 2016-03-14
PAPER REVISED: 2016-05-23
PAPER ACCEPTED: 2016-05-24
PUBLISHED ONLINE: 2016-07-12
DOI REFERENCE: https://doi.org/10.2298/TSCI160314159M
CITATION EXPORT: view in browser or download as text file
THERMAL SCIENCE YEAR 2016, VOLUME 20, ISSUE Issue 4, PAGES [1161 - 1169]
REFERENCES
  1. ***, Flexible Generation: Backing Up Renewables, Renewables Action Plan (RESAP), EURELECTRIC, Brussels, 2011
  2. Starkloff, R., et al., Development and Validation of a Dynamic Simulation Model for a Large Coal-fired Power Plant, Appl. Ther. Eng., 91 (2015), Dec., pp. 496-506
  3. Taler, J., et al., Optimization of the Boiler Start-up Taking Into Account Thermal Stresses, Energy, 92 (2015), 1, pp. 160-170
  4. Lucquiaud, M., et al., Enhanced Operating Flexibility and Optimised Off-design Operation of Coal Plants with Post-combustion Capture, Energy Procedia, 63 (2014), Dec., pp. 7494-7507
  5. Schuhbauer, C., et al., Coupled Simulation of a Tangentially Hard Coal Fired 700 °C Boiler, Fuel, 122 (2014), Apr., pp. 149-163
  6. ***, Brussels: European Committee for Standardization, BS EN 12952-3:2001 ‒ Water-Tube Boilers and Auxiliary Installations, Design and Calculation of Pressure Parts, 2001
  7. ***, Brussels: European Committee for Standardization, BS EN 12952-4:2000 ‒ Water-Tube Boilers and Auxiliary Installations, In-Service Boiler Life Expectancy, 2000
  8. Dzierwa, P., Taler, J., Optimum Heating of Pressure Vessels With Holes, J. Press. Vess. Technol., 137 (2014), 1, pp. 011202
  9. Shankar, R., Feasibility of Wear and Tear Sensors for Flexible Plant Operations, EPRI Tech. Update, 2003
  10. Kubik, M. L., et al., Increasing Thermal Plant Flexibility in a High Renewables Power System, Appl. Energy, 154 (2015), Sep., pp. 102-111
  11. Kruger, K., et al., Optimization of Boiler Start-up Using a Nonlinear Boiler Model and Hard Constraints, Energy, 29 (2004), 12-15, pp. 2239-2251
  12. Lončar, D., Application of Fuzzy Logic in Thermal Power Plant Control Systems, Ph. D. thesis, University of Zagreb, Zagreb, 2001

© 2024 Society of Thermal Engineers of Serbia. Published by the Vinča Institute of Nuclear Sciences, National Institute of the Republic of Serbia, Belgrade, Serbia. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution-NonCommercial-NoDerivs 4.0 International licence