TY - JOUR TI - Evaluation and analysis of exergoeconomic performance for the calcination process of green petroleum coke in vertical shaft kiln AU - Li Peng AU - Li Baokuan AU - Liu Zhongqiu AU - Rong Wenjie JN - Thermal Science PY - 2022 VL - 26 IS - 2 SP - 1999 EP - 2012 PT - Article AB - The main objective of this paper is to establish a mathematical framework to analyze the complex thermal economic performance of the calcination process. To find the factors affecting exergy efficiency loss, different exergy destruction is investigated in detail. Furthermore, the exergy flow cost model for exergy cost saving has also been developed. The results show that the vertical shaft furnace is a self-sufficiency equipment without additional fuel required, but the overall exergy destruction accounts for 54.11% of the total exergy input. In addition, the energy efficiency of the waste heat recovery boiler and thermal deaerator are 83.52% and 96.40%, whereas the exergy efficiency of the two equipment are 65.98% and 94.27%. Furthermore, the import exergy flow cost of vertical shaft furnace, waste heat recovery boiler and thermal deaerator are 366.5197 RMB per MJ, 0.1426 RMB per MJ, and 0.0020 RMB per MJ, respectively. Based on the result, several suggestions were proposed to improve the exergoeconomic performance. Assessing the performance of suggested improvements, the total exergy destruction of vertical shaft furnace is reduced to 134.34 GJ per hours and the exergy efficiency of waste heat recovery boiler is raised up to 66.02%. Moreover, the import exergy flow cost of the three different equipment is reduced to 0.0329 RMB per MJ, 0.1304 RMB per MJ, and 0.0002 RMB per MJ, respectively.